Azabache solar power project (60.9 MW) he first non-conventional hybrid renewable generation plant in the country operates in conjunction with the wind farm to generate renewable energy from solar radiation and the wind. This plant will help inject an annual average of 184 GWh into the National Electric System, avoiding approximately 135,000 tons of carbon dioxide emissions. This milestone is aligned with the objective of carbon neutrality by 2040.
Azabache solar power project
Category
Renewable Energy
Country
Chile
Project Type
Solar
N/A Million
Estimated USD Cost
2022
Year
Commissioned
Status
Chile
Country
Capacity
60900 KW
Funding
N/A
Funding
N/A
Development Partner
Enel Green Power